Going to the Moon and reusing all of the hardware for more missions requires most of the vehicles and associated components mentioned previously, plus a few more. After everything is completed, the spaceport will look similar to a small military base.
The six categories of Phase I operations can be further broken down:
1. Reentry Vehicle
- RV Manufacturing
- RV Hanger
- RV Processing
- Payload Processing and Loading
- Office Spaces
- Mission Control Center
- Ready Rooms
- Astronaut Training
- Flight Simulators
- Business Offices
- Food Preparation
- Laundry
- etc.
- RV Ferry
- C–5A Galaxy Cargo Aircraft
- C–5A Hanger
- RV Ferry Portable Aeronautics Cockpit
- VEM
- RV Launch and Recovery
- RV Ground Transport System
- RV Launch Pads
- 10,000–foot Runway
- OV
- RL–10 Rocket Engine (Contracted out)
- PM
- Propellant Output Docking Collar
- LV
- Lunar Landing Kit
- OV
- PM
- LV
- CV Core
- CV "Saddlebag"
- Propellant Output Docking Collar
- UV
- Airlock
- Inchworm Remote Manipulator System (RMS)
- CV Core Manufacturing
- CV "Saddlebag"
- CM1_4–4 Manufacturing
- Garage
- Emergency Airlock
- C–21A Executive Aircraft
- C–21A Hanger
- CH–53D Helicopter
- CH–53D Hanger
- Spacesuits (Contracted out)
- Water Pipeline
- Water Pumps
- Solar Power
- Photovoltaic Modules
- Batteries
- Hardware
- Firefighting Facility
- Hospital Facility
- Lunar LOX Components
- CM2_10–8
- Lunar LOX Modules
- Lunar Solar Power System
- SV Core
- Crane
- Extra Battery
- SV Self–Extractor
- Bills
- Payroll
- Utilities
- Insurance
- etc.
::