SPACE SHUTTLE OPERATIONS


Our Space Shuttle will have a very robust flight schedule.

Our calendar will be divided into four Quarters, with each lasting 91 days. Each Quarter is further divided into six 15–day segments, and an extra day attached at the end.

We plan to fly 8 days out of 15 days. Each flight day will consist of three Space Shuttle launches. This gives us an astonishing 24 spaceflights every 15 days, or 144 flights every Quarter.

A robust flight schedule indeed.

::

For passengers going up (crew or tourists), they will wake up, have breakfast, and blast off into space.

The following launch timelines (Tables 1, 2, and 3) are for the passenger version of the shuttle:


START

END

DURATION

WAKEUP

05:30



MORNING ROUTINE

05:30

06:30

1:00

BREAKFAST

06:30

07:00

0:30

ONLOAD PASSENGERS

07:00

07:20

0:20

PASSENGER DOOR CLOSED

07:20

07:22

0:02

Table 1: Abbreviated Passenger Travel Day Timeline


START

END

DURATION

PREFLIGHT PREPARATION

07:22



PAYLOAD INSTALLATION

07:22

07:52

0:30

CLOSE PAYLOAD DOORS

07:52

07:57

0:05

FLIGHT READY CHECK

07:57

08:02

0:05

HANGAR FLIGHT CHECKS

08:02

08:12

0:10

DELIVER TO LAUNCH PAD

08:12

08:33

0:21

INSTALL ON LAUNCH PAD

08:33

08:43

0:10

ROTATE TO VERTICAL

08:43

08:53

0:10

NITROGEN PURGE

08:53

09:03

0:10

TANK CHILLDOWN

09:03

09:13

0:10

PROPELLANT LOADING

09:13

09:58

0:45

FLIGHT READY HOLD

09:58

09:59

0:01

FINAL FLIGHT CHECK

09:59

10:00

0:01

LIFTOFF

10:00



Table 2: Abbreviated Preflight Timeline


START

END

DURATION

RENDEZVOUS

10:00

10:51

0:51

DOCKING ROUTINE

10:51

11:43

0:52

HATCH OPEN

11:43

 

 

EXIT SHUTTLE

11:43

12:00

0:17

LUNCH

12:00

12:30

0:30

OFF DUTY

12:30

19:00

6:30

DINNER

19:00

19:30

0:30

OFF DUTY

19:30

22:45

3:15

SLEEP

22:45

04:45

6:00

WAKEUP

04:45



MORNING ROUTINE

04:45

06:30

1:45

BREAKFAST

06:30

07:00

0:30

ON DUTY

07:00



Table 3: 
Abbreviated Passenger Arrival Timeline

::

For passengers going down (crew or tourists), they will wake up, have breakfast, and land back on Earth.

The following landing timelines (Tables 4, 5, and 6) are for the passenger version of the shuttle:


START

END

DURATION

REPORT TO SHUTTLE

07:00

07:56

0:56

CLOSE HATCH

07:56



UNDOCK

07:56

08:16

0:30

MOVE AWAY

08:16

09:07

0:20

DEORBIT

09:07

09:37

0:30

REENTRY

09:37

10:20

0:43

UNPOWERED GLIDE

10:20

10:40

0:20

LANDING

10:40

10:45

0:05

Table 4: Abbreviated Landing Timeline


START

END

DURATION

FULL STOP

10:45



RUNWAY SAFETY CHECKS

10:45

10:55

0:10

TOW TRUCK ATTACHMENT

10:55

10:57

0:02

TOW TO HANGER

10:57

11:17

0:20

INSTALL IN HANGER

11:17

11:27

0:10

HANGER POSTFLIGHT

11:27

11:37

0:10

OPEN PAYLOAD DOORS

11:37

11:42

0:05

REMOVE PAYLOAD

11:42

12:12

0:30

POSTFLIGHT

12:12



Table 5: Abbreviated Post–Landing Timeline


START

END

DURATION

PASSENGER DOOR OPEN

12:12



OFFLOAD

12:12

12:30

0:18

LUNCH / CELEBRATION

12:30

15:00

2:30

PASSENGERS DISMISSED

15:00



Table 6: 
Abbreviated Postflight Passenger Timeline

The crew go on to Shore Leave from the party, whilst the tourists go home.

::